[ Contents] [ Prev] [ Next] [ Index] [ Report an Error]

latch-deadlock-delay

Syntax

latch-deadlock-delay seconds

Hierarchy Level

[edit services pgcp gateway gateway-name data-inactivity-detection]

Release Information

Statement introduced in JUNOS Release 9.3.

Description

Configure the time after which the virtual BGF begins checking for data packets on terminations that include a latch event.

Options

seconds—Time interval before checking for data packets.

Range: 0 through 3600

Required Privilege Level

interface—To view this statement in the configuration.

interface-control—To add this statement to the configuration.

Related Topics

JUNOS Multiplay Solutions Guide


[ Contents] [ Prev] [ Next] [ Index] [ Report an Error]