- play_arrow Overview
- play_arrow Site Planning, Preparation, and Specifications
- play_arrow Initial Installation and Configuration
- play_arrow Maintaining Components
- Routine Maintenance Procedures for EX9200 Switches
- Maintaining the EX9200 Cooling System
- Maintaining the EX9208 Power System
- Maintaining the EX9200 Host Subsystem
- Maintaining the EX9200 Line Cards
- Maintain Transceivers
- Maintaining Alarm Relay Wire
- Maintain Fiber-Optic Cables
- Maintaining the EX9208 Cable Management Brackets
- Removing an EX9208 from a Rack or Cabinet
- play_arrow Troubleshooting Hardware
- play_arrow Contacting Customer Support and Returning the Chassis or Components
- play_arrow Safety and Compliance Information
- General Safety Guidelines and Warnings
- Definitions of Safety Warning Levels
- Qualified Personnel Warning
- Warning Statement for Norway and Sweden
- Fire Safety Requirements
- Installation Instructions Warning
- Chassis and Component Lifting Guidelines
- Restricted Access Warning
- Ramp Warning
- Rack-Mounting and Cabinet-Mounting Warnings
- Grounded Equipment Warning
- Radiation from Open Port Apertures Warning
- Laser and LED Safety Guidelines and Warnings
- Maintenance and Operational Safety Guidelines and Warnings
- General Electrical Safety Guidelines and Warnings
- Action to Take After an Electrical Accident
- Prevention of Electrostatic Discharge Damage
- AC Power Electrical Safety Guidelines
- AC Power Disconnection Warning
- DC Power Electrical Safety Guidelines
- DC Power Disconnection Warning
- DC Power Grounding Requirements and Warning
- DC Power Wiring Sequence Warning
- DC Power Wiring Terminations Warning
- Multiple Power Supplies Disconnection Warning
- TN Power Warning
- Agency Approvals for EX Series Switches
- Battery Compliance Statement for Environmental Requirements for EX Series Switches
- Compliance Statements for EMC Requirements for EX Series Switches
- Compliance Statements for Acoustic Noise for EX Series Switches
Claim, Onboard, and Configure EX9208
This topic provides you the pointers to onboard and configure EX9208 switches using Mist, or configure EX9208 switches using Junos CLI.
EX9208 switch is a cloud-ready switch, and you can manage this switch using Mist AI cloud portal. If you have a Mist Wired Assurance license, you can follow a few simple steps to get an EX9208 up and running in the Juniper Mist AI cloud portal. See Table 1 for more information.
If you want to | Then |
---|---|
Claim and Onboard to Mist | See Cloud-Ready EX and QFX Switches with Mist |
Configure Wired Assurance | |
See all documentation available for Wired Assurance |
If you do not have a Mist Wired Assurance license, you can configure EX9208 using Junos CLI. See Table 2 for more information.
If you want to | Then |
---|---|
Customize basic configuration | See Configure Junos OS on the EX9208 |
Explore the software features supported on EX9208 | See Feature Explorer |
Configure Junos features on EX9208 | See User Guides |