MX2020 Site Preparation Checklist
The checklist in Table 1 summarizes the tasks you must perform when preparing a site for router installation.
Item or Task |
For More Information |
Performed By |
Date |
---|---|---|---|
Environment |
|||
Verify that environmental factors such as temperature and humidity do not exceed router tolerances. |
|||
Power |
|||
Measure distance between external power sources and router installation site. |
MX2020 DC Power Distribution Module (-48 V) Description MX2000 DC Power Distribution Module (240 V China) Description MX2000 High-Voltage Universal (HVAC/HVDC) Power Distribution Module Description |
||
Locate sites for connection of system grounding. |
|||
Calculate the power consumption and requirements. |
|||
Rack |
|||
Verify that your rack meets the minimum requirements for the installation of the router. Note:
There must be a minimum of 45U of usable rack space when installing the MX2020 router into a 45U rack. |
|||
Plan rack or cabinet location, including required space clearances. Note:
If you are installing the MX2020 router into a network cabinet, make sure that no hardware, device, rack, or cabinet component obstructs the 45U rack space from access during installation. |
MX2020 Cabinet Size and Clearance Requirements, MX2020 Rack Requirements, Clearance Requirements for Airflow and Hardware Maintenance for the MX2020 Router |
||
If a rack is used, secure rack to floor and building structure. |
|||
Cables and Transceivers |
|||
Acquire cables and transceivers:
|
Fiber-Optic Cable Signal Loss, Attenuation, and Dispersion Calculating Power Budget and Power Margin for Fiber-Optic Cables |
||
Plan the cable routing and management. |