Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

header-navigation
keyboard_arrow_up
close
keyboard_arrow_left
list Table of Contents
file_download PDF
{ "lLangCode": "en", "lName": "English", "lCountryCode": "us", "transcode": "en_US" }
English
keyboard_arrow_right

MX240 Site Preparation Checklist

date_range 17-Apr-21

The checklist in Table 1 summarizes the tasks you must perform when preparing a site for router installation.

Table 1: Site Preparation Checklist

Item or Task

For More Information

Performed By

Date

Verify that environmental factors such as temperature and humidity do not exceed router tolerances.

MX240 Router Environmental Specifications

   

Select the type of rack or cabinet.

MX240 Router Rack Requirements,MX240 Router Cabinet Size and Clearance Requirements

   

Plan rack or cabinet location, including required space clearances.

MX240 Router Rack Requirements, MX240 Router Clearance Requirements for Airflow and Hardware Maintenance, MX240 Router Cabinet Size and Clearance Requirements

   

If a rack is used, secure rack to floor and building structure.

MX240 Router Rack Requirements

   

Acquire cables and connectors.

     

Locate sites for connection of system grounding.

MX240 Chassis Grounding Specifications

   

Measure distance between external power sources and router installation site.

     

Calculate the optical power budget and optical power margin.

Calculating Power Budget and Power Margin for Fiber-Optic Cables

   
footer-navigation