- play_arrow Fast Track: Initial Installation
- play_arrow Overview
- MX240 System Overview
- MX240 Chassis
- MX240 Cooling System
- MX240 Air Deflector Kits
- MX240 AC Power System
- MX240 DC Power System
- MX240 Host Subsystem Components and Descriptions
- MX240 Line Card Components and Descriptions
- Services Processing Card—MX-SPC3 Services Card
- MX-Series Switch Control Board (SCB) Description
- play_arrow Initial Installation and Configuration
- play_arrow Maintaining, Installing and Replacing Components
- Maintaining MX240 Components
- Maintaining the MX240 Cooling System Component
- Maintaining MX240 Host Subsystem Components
- Maintaining MX240 Interface Modules
- Maintaining MX-SPC3 Services Card
- Maintaining MX240 Power System Components
- Maintaining MX240 SFP and XFP Transceivers
- Maintaining MX240 Switch Control Boards
- play_arrow Troubleshooting Hardware
- play_arrow Contacting Customer Support and Returning the Chassis or Components
- play_arrow Safety and Compliance Information
- General Safety Guidelines and Warnings
- Definitions of Safety Warning Levels
- Qualified Personnel Warning
- Fire Safety Requirements
- Warning Statement for Norway and Sweden
- Preventing Electrostatic Discharge Damage to an MX240 Router
- Installation Instructions Warning
- MX240 Chassis Lifting Guidelines
- Ramp Warning
- Rack-Mounting and Cabinet-Mounting Warnings
- Grounded Equipment Warning
- Laser and LED Safety Guidelines and Warnings
- Radiation from Open Port Apertures Warning
- Maintenance and Operational Safety Guidelines and Warnings
- General Electrical Safety Guidelines and Warnings
- Prevention of Electrostatic Discharge Damage
- AC Power Electrical Safety Guidelines
- AC Power Disconnection Warning
- MX240 DC Power Electrical Safety Guidelines
- DC Power Copper Conductors Warning
- DC Power Disconnection Warning
- DC Power Grounding Requirements and Warning
- DC Power Wiring Sequence Warning
- DC Power Wiring Terminations Warning
- Midplane Energy Hazard Warning
- Multiple Power Supplies Disconnection Warning
- Action to Take After an Electrical Accident
- Site Electrical Wiring Guidelines for MX Series Routers
- Agency Approvals and Compliance Statements
MX240 Site Preparation Checklist
The checklist in Table 1 summarizes the tasks you must perform when preparing a site for router installation.
Item or Task | For More Information | Performed By | Date |
---|---|---|---|
Verify that environmental factors such as temperature and humidity do not exceed router tolerances. | |||
Select the type of rack or cabinet. | MX240 Router Rack Requirements,MX240 Router Cabinet Size and Clearance Requirements | ||
Plan rack or cabinet location, including required space clearances. | MX240 Router Rack Requirements, MX240 Router Clearance Requirements for Airflow and Hardware Maintenance, MX240 Router Cabinet Size and Clearance Requirements | ||
If a rack is used, secure rack to floor and building structure. | |||
Acquire cables and connectors. | |||
Locate sites for connection of system grounding. | |||
Measure distance between external power sources and router installation site. | |||
Calculate the optical power budget and optical power margin. | Calculating Power Budget and Power Margin for Fiber-Optic Cables |