- play_arrow Overview
- play_arrow Site Planning, Preparation, and Specifications
- play_arrow Initial Installation and Configuration
- QFX10008 Installation Overview
- Unpacking the QFX10008
- Installing the Mounting Hardware for a QFX10000
- Installing the QFX10008 into a Rack
- Installing the Front Panel on a QFX10000
- Connecting the QFX10008 or QFX10016 to Power
- Connecting the QFX10000 to External Devices
- Register Products—Mandatory to Validate SLAs
- Performing an Initial Configuration of a QFX10000
- play_arrow Maintaining Components
- Handling and Storing QFX10000 Line Cards, RCBs, and SIBs
- Maintaining QFX10000 Routing and Control Boards
- Maintaining QFX10008 Cooling System
- Maintaining QFX10000 Power System
- Maintaining QFX10000 Switch Interface Boards
- Maintaining QFX10000 Line Cards
- Maintaining QFX10000 Solid State Drives
- Maintaining Transceivers and Fiber-Optic Cables on QFX10000
- Removing the QFX10008
- play_arrow Troubleshooting
- play_arrow Contacting Customer Support and Returning the Chassis or Components
- play_arrow Safety and Compliance Information
- General Safety Guidelines and Warnings
- Definitions of Safety Warning Levels
- Qualified Personnel Warning
- Warning Statement for Norway and Sweden
- Fire Safety Requirements
- Installation Instructions Warning
- Chassis and Component Lifting Guidelines
- Restricted Access Warning
- Ramp Warning
- Rack-Mounting and Cabinet-Mounting Warnings
- Grounded Equipment Warning
- Radiation from Open Port Apertures Warning
- Laser and LED Safety Guidelines and Warnings for the QFX Series
- Maintenance and Operational Safety Guidelines and Warnings
- General Electrical Safety Guidelines and Warnings
- Action to Take After an Electrical Accident
- Prevention of Electrostatic Discharge Damage
- AC Power Electrical Safety Guidelines
- AC Power Disconnection Warning
- DC Power Electrical Safety Guidelines
- DC Power Disconnection Warning
- DC Power Grounding Requirements and Warning
- DC Power Wiring Terminations Warning
- Multiple Power Supplies Disconnection Warning
- TN Power Warning
- Agency Approvals for the QFX Series
- Compliance Statements for EMC Requirements for the QFX Series
- QFX Series Compliance Statements for NEBS
- Compliance Statements for Environmental Requirements
QFX10008 Switch Hardware Guide
Use this guide to plan, install, perform initial software configuration, perform routine maintenance, and to troubleshoot QFX10008 modular switches.
After completing the installation and basic configuration procedures covered in this guide, refer to the Junos OS documentation for further software configuration.