- play_arrow Fast Track: Initial Installation
- play_arrow Overview
- play_arrow Initial Installation and Configuration
- play_arrow Maintaining Components
- play_arrow Troubleshooting Hardware
- play_arrow Contacting Customer Support and Returning the Chassis or Components
- play_arrow Safety and Compliance Information
- Definitions of Safety Warning Levels
- General Safety Guidelines and Warnings
- Restricted Access Warning
- Qualified Personnel Warning
- Prevention of Electrostatic Discharge Damage
- Fire Safety Requirements
- Laser and LED Safety Guidelines and Warnings
- Radiation from Open Port Apertures Warning
- Battery-Handling Warning
- Lightning Activity Warning
- Jewelry Removal Warning
- Operating Temperature Warning
- Product Disposal Warning
- Action to Take After an Electrical Accident
- General Electrical Safety Guidelines and Warnings
- SRX300 Agency Approvals and Compliance Statements
Site Preparation Checklist for the SRX300 Firewall
Table 1 provides a checklist of tasks you need to perform when preparing a site for installing the SRX300 Firewall.
Item or Task | Additional Information | Performed By | Date | Notes |
---|---|---|---|---|
Environment | ||||
Verify that environmental factors such as temperature and humidity do not exceed device tolerances. | ||||
Power | ||||
| SRX300 Services Gateway Electrical Wiring Guidelines SRX300 Services Gateway Power Specifications and Requirements | |||
Rack Requirements | ||||
Verify that your rack meets the minimum requirements. | SRX300 Services Gateway Rack-Mounting Requirements and Warnings | |||
Rack Installation | ||||
| Preparing the SRX300 Services Gateway for Rack-Mount Installation | |||
Cabinet Requirements | ||||
| SRX300 Services Gateway Cabinet Size and Clearance Requirements | |||
Wall Installation | ||||
| Preparing the SRX300 Services Gateway for Wall-Mount Installation | |||
Desktop Installation | ||||
| Preparing the SRX300 Services Gateway for Desk-Mount Installation | |||
Cables | ||||
|