Site Preparation Checklist for SRX4300
The checklist in Table 1 summarizes the tasks you need to perform when preparing a site to install the SRX4300.
Item or Task | Additional Information |
---|---|
Environment | |
Verify that environmental factors such as temperature and humidity do not exceed device tolerance levels. | |
Power | |
Measure the distance between the external power sources and the device installation site. | |
Locate sites for connection of system grounding. | |
Calculate the power consumption and requirements. | |
Rack Requirements | |
Verify that your rack meets the minimum requirements. | |
Rack Installation | |
Plan the rack location, including required space clearances. | |
Secure the rack to the floor and building structure. | |
Cables | |
|