Site Preparation Checklist for SSR1300

The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for SSR1300 installation.

Table 1: Site Preparation Checklist for SSR1300 Installation

Item or Task

Additional Information

Environment

Verify that environmental factors such as temperature and humidity do not exceed device tolerances.

Environmental Requirements and Specifications for SSR1300

Power

Measure the distance between the external power sources and the device installation site.

Locate sites for connection of system grounding.

 

Calculate the power consumption and requirements.

Rack Requirements

Verify that your rack meets the minimum requirements.

Rack Requirements for SSR1300

Rack Installation

Plan the rack location, including required space clearances.

Clearance Requirements for Hardware Maintenance of SSR1300

Secure the rack to the floor and building structure.

Cables

  • Acquire cables and connectors.

  • Review the maximum distance allowed for each cable. Choose the length of cable based on the distance between the hardware components being connected.

  • Plan the cable routing and management.