- play_arrow Overview
- play_arrow Initial Installation and Configuration
- play_arrow Maintaining Components
- play_arrow Contacting Customer Support and Returning the Chassis or Components
- play_arrow Safety and Compliance Information
- Definitions of Safety Warning Levels
- General Safety Guidelines and Warnings
- Restricted Access Warning
- Qualified Personnel Warning
- Prevention of Electrostatic Discharge Damage
- Fire Safety Requirements
- Laser and LED Safety Guidelines and Warnings
- Chassis and Component Lifting Guidelines
- Radiation from Open Port Apertures Warning
- Maintenance and Operational Safety Guidelines and Warnings
- Action to Take After an Electrical Accident
- General Electrical Safety Guidelines and Warnings
- SSR1400 Agency Approvals
- FCC and EMC Declarations
- Lithium Battery Declaration
Site Preparation Checklist for SSR1400
The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for SSR1400 installation.
Item or Task | Additional Information |
---|---|
Environment | |
Verify that environmental factors such as temperature and humidity do not exceed device tolerances. | |
Power | |
Measure the distance between the external power sources and the device installation site. | |
Locate sites for connection of system grounding. | |
Calculate the power consumption and requirements. | |
Rack Requirements | |
Verify that your rack meets the minimum requirements. | |
Rack Installation | |
Plan the rack location, including required space clearances. | |
Secure the rack to the floor and building structure. | |
Cables | |
|