Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

Announcement: Try the Ask AI chatbot for answers to your technical questions about Juniper products and solutions.

close
header-navigation
keyboard_arrow_up
close
keyboard_arrow_left
Juniper Apstra 5.1.0 User Guide
Table of Contents Expand all
list Table of Contents
file_download PDF
{ "lLangCode": "en", "lName": "English", "lCountryCode": "us", "transcode": "en_US" }
English
keyboard_arrow_right

Add Link per Superspine (5-Stage)

Release: Juniper Apstra 5.1
{}
Change Release
date_range 21-Mar-25
As a Day 2 operation, you can add links per superspine on 5-stage blueprints.
  1. From the blueprint, navigate to Staged > Physical > Pods.
  2. Click the Update spine config button on the bottom-right of the card for the pod to change.
  3. In the Link per superspine field, enter the total number of links you want between spines and superspines. You can only add links. Plan carefully. After you add links, you won't be able to remove them later.
  4. Click Update to stage your changes and return to the Pods view.

When you're ready to activate changes, commit them from the Uncommitted tab.

footer-navigation