Reconfigure Static Tunnels
Contrail Service Orchestration (CSO) creates static overlay tunnels between a branch site and an enterprise hub site or between two enterprise hub sites, based on matching mesh tags associated with the WAN link.
If you modify the mesh tags for a WAN link while editing a branch or an enterprise hub site, the existing static tunnels are not updated. To apply the changes that you made to the WAN link, you must manually reconfigure the static tunnels.
To reconfigure the static tunnels associated with a provider hub site, you must edit the site and update the overlay tunnel information in the Connects to Hubs (Overlay Tunnel Type and Overlay Peer Interface) fields.
We recommend that you reconfigure the static tunnels during a downtime or when traffic between the sites is not expected because reconfiguring the existing static tunnels can result in connectivity loss between the sites in the tenant.
A Tenant Administrator user can reconfigure static tunnels between a branch site and an enterprise hub site or between two enterprise hub sites in the Customer Portal.
To reconfigure static tunnels for a site: