Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

header-navigation
keyboard_arrow_up
close
keyboard_arrow_left
Junos CLI Reference
Table of Contents Expand all
list Table of Contents
file_download PDF
{ "lLangCode": "en", "lName": "English", "lCountryCode": "us", "transcode": "en_US" }
English
keyboard_arrow_right

cfp-to-et

date_range 12-Dec-23

Syntax

content_copy zoom_out_map
cfp-to-et;

Hierarchy Level

content_copy zoom_out_map
[edit chassis fpc slot]

Description

Make the interface et-0/1/0 (on the QSFP28 port) available for use. After you configure the set chassis fpc 0 cfp-to-et command and commit the configuration, you need to restart the FPC by executing the restart chassis-control command. After the FPC comes online, interface et-0/1/0 is created and et-0/2/1(on the CFP2 port) is deleted.

Note:

Before executing this command, plan to handle disruption of services.

Required Privilege Level

interface—To view this statement in the configuration.

interface-control—To add this statement to the configuration.

Release Information

Statement introduced in Junos OS Release 19.2R1-S1.

footer-navigation