Scheduling Reports
You can run Network Director reports as needed or you can automate reports to run in batch by creating a schedule. You can associate a single schedule with one or more reports when you create the report definition. Although you can create a schedule during the report definition process, it is helpful to have the schedules configured before defining the report. To create a new schedule you name the schedule and set the time and frequency of the run.
This topic describes:
How to Create or Manage Schedules
You create a schedule from the Manage Schedules page. You can display this page from the Report mode Tasks pane.
Select Report in the Network Director banner. The Report mode Tasks pane displays the tasks available in the Report mode. Reports run in any network view (Logical, Location, or Device).
Select Manage Schedules in the Tasks pane. The Manage Schedules page opens, displaying all existing report schedules.
From the Manage Schedules page, you can:
Create a new schedule
Edit an existing schedule
See the details of a schedule
Delete a schedule
Managing Schedules
Use the Manage Schedules page to administer report schedules. From this page, you can create new schedules and view, modify, and delete existing schedules. On the Manage Schedules page, a table of existing report schedules appears. You can sort and customize this table to exclude fields that might not be relevant to your needs. The fields in the table are defined in Table 1.
Field |
Description |
---|---|
Schedule Name |
The name of the schedule. Indicate the purpose of the schedule in the name. |
Schedule Type |
Schedules are either One-Time or Recurring.
|
Recurrence Pattern |
How often the pattern repeats. The pattern applies only to recurring schedules. Valid values are:
|
Description |
Details of the reoccurrence pattern. |
Status |
Either Active or blank. Active indicates the schedule is running. |
From this page you can:
Display a summary of all the parameter settings of a schedule by selecting the schedule and clicking Details. The Report Schedule Summary opens.
Create a new schedule by clicking Add. The Create Schedule window opens.
Select a schedule and change the settings by clicking Edit. The Edit Schedule window opens.
Select a schedule and click Delete to remove a schedule.
CAUTION:Take care when deleting a schedule. Network Director enables you to delete a schedule even if it is active.
Creating New Schedules
Use the Create Schedule window to create a one-time or a recurring schedule.
To create a new schedule:
Editing Schedules
To change an existing schedule:
- Select a schedule from the list in the Manage Schedules page.
- Click Edit to reopen the schedule settings.
- Change the settings based on the values described in Table 2.
- Click Edit to save the revised settings.
Deleting Schedules
Network Director enables you to delete an active schedule. Be aware that deleting a schedule that is active will cause reports not to run.
You can also permanently remove a schedule by selecting the schedule in the Manage Schedule page and clicking Delete.