Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

Navigation

Verifying That Graceful Routing Engine Switchover Is Working in the Virtual Chassis

Purpose

Verify that a Graceful Routing Engine switchover (GRES) between two member switches acting as the master and backup routing engines in a Virtual Chassis has occurred.

Action

On the master switch, verify the member ID of the backup Routing Engine:

{master:0}
user@switch> show virtual-chassis
Virtual Chassis ID: 5efa.4b7a.aae6
                                          Mastership            Neighbor List  
Member ID  Status   Serial No    Model    priority    Role      ID  Interface
0 (FPC 0)  Prsnt    BM0208105281 ex4200-24t      255  Master*    1  vcp-0      
1 (FPC 1)  Prsnt    BP0208192350 ex4200-48t      255  Backup     0  vcp-0 

Member ID for next new member: 2 (FPC 2)

  1. Connect to the backup Routing Engine:
    {master:0}
    user@switch> request session member 1
    {backup:1}
    user@switch>
    
    
  2. Verify that the backup Routing Engine is ready for switchover on member ID 1:
    {backup:1}
    user@switch> show system switchover
    Graceful switchover: On
    Configuration database: Ready
    Kernel database: Ready
    Peer state: Steady State
    
    
  3. Switch the current backup Routing Engine to master Routing Engine:

    Note: You must wait a minimum of two minutes between Routing Engine failovers for the Routing Engines to synchronize.

    {backup:1}
    user@switch> request chassis routing-engine master acquire
  4. Verify that the master and backup Routing Engines have switched roles:

    Note: Member ID 1 is now the master and member ID 0 is now the backup.

    {master:1}
    user@switch> show virtual-chassis
    Virtual Chassis ID: 5efa.4b7a.aae6
                                              Mastership            Neighbor List  
    Member ID  Status   Serial No    Model    priority    Role      ID  Interface
    0 (FPC 0)  Prsnt    BM0208105281 ex4200-24t      255  Backup     1  vcp-0      
    1 (FPC 1)  Prsnt    BP0208192350 ex4200-48t      255  Master*    0  vcp-0      
    
    Member ID for next new member: 2 (FPC 2)
    
    

Meaning

With graceful Routing Engine switchover enabled, when you initiated a switchover from the backup Routing Engine, the backup Routing Engine became the master and the master Routing Engine became the backup.

Published: 2012-12-07