Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

header-navigation
keyboard_arrow_up
close
keyboard_arrow_left
list Table of Contents
file_download PDF
{ "lLangCode": "en", "lName": "English", "lCountryCode": "us", "transcode": "en_US" }
English
keyboard_arrow_right

Installing the MX2010 Standard Cable Manager

date_range 22-Mar-21

To install the standard cable manager (see Figure 1):

Note:

The MX2010 comes equipped with a standard lower cable manager. The extended lower cable manager can be ordered from Juniper Networks.

  1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to one of the ESD points on the chassis.
  2. Position the lower cable manager on the studs on the lower front of the chassis, just below the MPCs.
  3. Insert the screws into the corners in the lower cable manager onto the studs on the chassis.
  4. Using a Phillips (+) screwdriver (number 1 or 2), tighten the mounting screws securely.
  5. Replace the cable manager cover, and secure it with the two captive screws.
Figure 1: Installing the Standard Cable ManagerInstalling the Standard Cable Manager
footer-navigation