- play_arrow Overview
- play_arrow Site Planning, Preparation, and Specifications
- Site Preparation Checklist for ACX5448, ACX5448-D, and ACX5448-M Routers
- ACX5448, ACX5448-D, and ACX5448-M Site Guidelines and Requirements
- ACX5448, ACX5448-D, and ACX5448-M Network Cable and Transceiver Planning
- ACX5448, ACX5448-D, and ACX5448-M Management and Console Port Specifications and Pinouts
- play_arrow Initial Installation and Configuration
- ACX5448, ACX5448-D, and ACX5448-M Installation Overview
- Unpacking and Mounting ACX5448, ACX5448-D, and ACX5448-M
- Connect ACX5448, ACX5448-D, and ACX5448-M to Power
- Connect ACX5448, ACX5448-D, and ACX5448-M to External Devices
- Register Products—Mandatory to Validate SLAs
- Perform Initial Software Configuration for the ACX5448, ACX5448-D, and ACX5448-M Routers
- play_arrow Troubleshooting Hardware
- play_arrow Contacting Customer Support and Returning the Chassis or Components
- play_arrow Safety and Compliance Information
- General Safety Guidelines and Warnings
- Definitions of Safety Warning Levels
- Qualified Personnel Warning
- Warning Statement for Norway and Sweden
- Fire Safety Requirements
- Installation Instructions Warning
- Restricted Access Warning
- Ramp Warning
- Rack-Mounting and Cabinet-Mounting Warnings
- Grounded Equipment Warning
- Radiation from Open Port Apertures Warning
- Laser and LED Safety Guidelines and Warnings
- Maintenance and Operational Safety Guidelines and Warnings
- General Electrical Safety Guidelines and Warnings
- Prevention of Electrostatic Discharge Damage
- Site Electrical Wiring Guidelines
- AC Power Electrical Safety Guidelines
- AC Power Disconnection Warning
- DC Power Disconnection Warning
- DC Power Grounding Requirements and Warning
- DC Power Wiring Sequence Warning
- DC Power Wiring Terminations Warning
- Multiple Power Supplies Disconnection Warning
- TN Power Warning
- Action to Take After an Electrical Accident
- Agency Approvals for ACX5448, ACX5448-D, and ACX5448-M Routers
- Compliance Statements for Data Center
- Compliance Statements for EMC Requirements
- Compliance Statements for Environmental Requirements
Uninstall the ACX5448, ACX5448-D, or ACX5448-M Router
Power Off an ACX5400 Router
Before you power off an ACX5448 router:
Ensure that you have taken the necessary precautions to prevent electrostatic discharge (ESD) damage. See Prevention of Electrostatic Discharge Damage.
Ensure that you do not need to forward traffic through the router.
Ensure that you have the following parts and tools available to power off the router:
An ESD grounding strap
An external management device such as a PC
An RJ-45 to DB-9 rollover cable to connect the external management device to the console port
A Phillips number 2 screwdriver
To power off your ACX5400 router:
Remove an ACX5400 Router from a Rack or Cabinet
Before removing your ACX5400 router from its rack:
Ensure that you have the following parts and tools available:
A Phillips (+) screwdriver, number 2 or number 3, depending on the size of your rack mounting screws.
If you need to relocate an installed ACX5400 router, use the procedure described in this topic.
When you remove multiple devices from a rack, remove the device in the top of the rack first and proceed to remove the rest of the devices from top to bottom.
Ensure that the rack is stable and secured to the building.
Ensure that there is enough space to place the removed router in its new location and along the path to the new location.
Use the appropriate power-off sequence to safely power off the device. See Power Off an ACX5400 Router.
Disconnect the power cords.
Ensure that you have disconnected any cables or wires attached to the router ports.
To remove an ACX5400 router from a rack or cabinet:
- Have one person support the weight of the router while another person uses the screwdriver to remove the front mounting screws that attach the chassis mounting rails to the rack or cabinet.
- Slowly slide the router out of the rack, with the mounting rails attached to its sides.
- Use the screwdriver to remove the mounting screws that attach the mounting blades attached to the rear of the rack or cabinet.
- Place the removed screws and mounting blades in a labeled bag. You will need them when you reinstall the chassis.
- Transport the router to your new location.