Site Preparation Checklist for ACX7024 and ACX7024X Routers
The Site Preparation Checklist for ACX7024 and ACX7024X Routers summarizes the tasks you need to perform when preparing a site for an installation.
Item or Task |
For More Information |
Performed by |
Date |
---|---|---|---|
Environment | |||
Verify that environmental factors such as temperature and humidity do not exceed router tolerances. |
Environmental Requirements and Specifications for ACX7024 Routers |
|
|
Power | |||
Measure the distance between external power sources and router installation site. |
|
|
|
Calculate the power consumption and requirements. |
|
|
|
Rack or Cabinet | |||
Verify that your rack or cabinet meets the minimum requirements for the installation of the router. |
|
|
|
Plan rack or cabinet location, including required space clearances. |
Clearance Requirements for Hardware Maintenance of ACX7024 and ACX7024X Routers |
|
|
Secure the rack or cabinet to the floor and building structure. |
|
|
|
Cables | |||
Acquire cables and connectors:
|
|
|
|
Plan the cable routing and management. |
|
|
|