Site Preparation Checklist for the JRR200 Route Reflector

Table 1 provides a checklist of tasks you need to perform when preparing a site for installing the JRR200 Route Reflector.

Table 1: Site Preparation Checklist for JRR200 Route Reflector

Item or Task

Additional Information

Performed By

Date

Notes

Power

Measure distance between external power sources and device installation site.

 

Locate sites for connection of system grounding.

 

Calculate the power consumption and requirements.

JRR200 Power System

Environment

Verify that environmental factors such as temperature and humidity do not exceed device tolerances.

JRR200 Route Reflector Environmental Specifications

Rack or Cabinet

Verify that your rack or cabinet meets the minimum requirements for the installation of the device.

JRR200 Rack and Cabinet Requirements

Plan rack location, including required space clearances.

Secure the rack or cabinet to the floor and building structure.

Cables

Acquire cables and connectors:

  • Determine the number of cables needed based on your planned configuration.

  • Review the maximum distance allowed for each cable. Choose the length of cable based on the distance between the hardware components being connected.

Plan the cable routing and management.