- play_arrow Overview
- play_arrow Initial Installation and Configuration
- play_arrow Maintaining Components
- play_arrow Troubleshooting Hardware
- play_arrow Contacting Customer Support and Returning the Chassis or Components
- play_arrow Safety and Compliance Information
- General Safety Guidelines and Warnings
- Definitions of Safety Warning Levels
- Restricted Access Warning
- Fire Safety Requirements
- Qualified Personnel Warning
- Warning Statement for Norway and Sweden
- Installation Instructions Warning
- Chassis and Component Lifting Guidelines
- Ramp Warning
- Rack-Mounting and Cabinet-Mounting Warnings
- Grounded Equipment Warning
- Laser and LED Safety Guidelines and Warnings
- Radiation from Open Port Apertures Warning
- Maintenance and Operational Safety Guidelines and Warnings
- General Electrical Safety Guidelines and Warnings
- Prevention of Electrostatic Discharge Damage
- AC Power Electrical Safety Guidelines
- AC Power Disconnection Warning
- DC Power Disconnection Warning
- DC Power Grounding Requirements and Warning
- DC Power Wiring Sequence Warning
- DC Power Wiring Terminations Warning
- Multiple Power Supplies Disconnection Warning
- TN Power Warning
- Action to Take After an Electrical Accident
- JRR200 Agency Approvals and Regulatory Compliance Information
Site Preparation Checklist for the JRR200 Route Reflector
Table 1 provides a checklist of tasks you need to perform when preparing a site for installing the JRR200 Route Reflector.
Item or Task | Additional Information | Performed By | Date | Notes |
---|---|---|---|---|
Power | ||||
Measure distance between external power sources and device installation site. | ||||
Locate sites for connection of system grounding. | ||||
Calculate the power consumption and requirements. | ||||
Environment | ||||
Verify that environmental factors such as temperature and humidity do not exceed device tolerances. | ||||
Rack or Cabinet | ||||
Verify that your rack or cabinet meets the minimum requirements for the installation of the device. | ||||
Plan rack location, including required space clearances. | ||||
Secure the rack or cabinet to the floor and building structure. | ||||
Cables | ||||
Acquire cables and connectors:
| ||||
Plan the cable routing and management. |