Site Preparation Checklist for LWC Devices
The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for an LWC device installation.
Item or Task |
For More Information |
Performed by |
Date |
---|---|---|---|
Environment | |||
Verify that environmental factors such as temperature and humidity do not exceed device tolerances. |
Environmental Requirements and Specifications for an LWC Device |
||
Power | |||
Measure distance between external power sources and device installation site. |
|||
Locate sites for connection of system grounding. |
|||
Calculate the power consumption and requirements. |
|||
Rack or Cabinet | |||
Verify that your rack or cabinet meets the minimum requirements for the installation of the device. |
|||
Plan rack or cabinet location, including required space clearances. |
Clearance Requirements for Airflow and Hardware Maintenance for an LWC Device |
||
Secure the rack or cabinet to the floor and building structure. |
|||
Desk | |||
Verify that the desk meets the minimum requirements for the installation of the device. |
Requirements for Mounting an LWC Device on a Desktop or Other Level Surface |
||
Verify that there is appropriate clearance in your selected location. |
Clearance Requirements for Airflow and Hardware Maintenance for an LWC Device |
||
Cables | |||
Acquire cables and connectors:
|
|||
Plan the cable routing and management. |