Help us improve your experience.

Let us know what you think.

Do you have time for a two-minute survey?

 
 

MX304 Site Preparation Checklist

The checklist in Table 1 summarizes the tasks you must perform before you install your router.

Table 1: MX304 Site Preparation Checklist

Item or Task

For More Information

Performed By

Date

Environment

Verify that environmental factors such as temperature and humidity do not exceed router tolerances.

MX304 Router Environmental Specifications    
Power

Locate sites to use for grounding the system.

MX304 Router Grounding Specifications

   

Measure the distance between external power sources and the router installation site.

MX304 Router AC Power Specifications

MX304 Router High-Voltage AC/DC Power Specifications

MX304 Router DC Power Specifications

   

Calculate the power consumption and requirements.

Calculating Power Requirements for MX304 Router

   
Rack

Select the type of rack or cabinet.

Install the MX304 Router in a Four-Post Rack

Install the MX304 Router in a Two-Post Rack

   

Plan where you want to locate the rack or cabinet, including the required space clearances.

MX304 Router Rack Requirements

MX304 Router Cabinet Requirements and Specifications

   

If you're installing the router in a rack, secure the rack to the floor and building structure.

MX304 Router Cabinet Requirements and Specifications

   
Cables

Gather cables and connectors:

  • Determine the number of cables you need based on your configuration.

  • Review the maximum distance allowed for each cable. Choose the length of cable based on the distance between the hardware components you're connecting.

MX304 Network Cable and Transceiver Planning