MX304 Site Preparation Checklist
The checklist in Table 1 summarizes the tasks you must perform before you install your router.
Item or Task |
For More Information |
Performed By |
Date |
---|---|---|---|
Environment | |||
Verify that environmental factors such as temperature and humidity do not exceed router tolerances. |
MX304 Router Environmental Specifications | ||
Power | |||
Locate sites to use for grounding the system. |
|||
Measure the distance between external power sources and the router installation site. |
MX304 Router AC Power Specifications |
||
Calculate the power consumption and requirements. |
|||
Rack | |||
Select the type of rack or cabinet. |
|||
Plan where you want to locate the rack or cabinet, including the required space clearances. |
|||
If you're installing the router in a rack, secure the rack to the floor and building structure. |
|||
Cables | |||
Gather cables and connectors:
|