Site Preparation Checklist for the SRX340 Firewall
Table 1 provides a checklist of tasks you need to perform when preparing a site for installing the SRX340 Firewall.
Item or Task |
Additional Information |
Performed By |
Date |
Notes |
---|---|---|---|---|
Environment |
||||
Verify that environmental factors such as temperature and humidity do not exceed device tolerances. |
||||
Power |
||||
Measure the distance between the external power sources and the device installation site. |
||||
Locate sites for connection of system grounding. |
||||
Calculate the power consumption and requirements. |
SRX340 Services Gateway Power Specifications and Requirements |
|||
Rack Requirements |
||||
Verify that your rack meets the minimum requirements. |
SRX340 Services Gateway Rack-Mounting Requirements and Warnings |
|||
Rack Installation |
||||
Plan the rack location, including required space clearances. |
Preparing the SRX340 Services Gateway for Rack-Mount Installation |
|||
Secure the rack to the floor and building structure. |
Connecting the SRX340 Services Gateway to the Building Structure |
|||
Cabinet Requirements |
||||
Verify that your cabinet meets the minimum requirements. |
||||
Plan the cabinet location, including required space clearances. |
||||
Cables |
||||
|