Site Preparation Checklist for a QFX3100 Director Device
The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for a QFX3100 Director device installation.
Table 1: Site Preparation Checklist
Item or Task | For More Information | Performed By | Date |
---|---|---|---|
Environment | |||
Verify that environmental factors such as temperature and humidity do not exceed QFX3100 Director device tolerances. | Environmental Requirements and Specifications for a QFX3100 Director Device | ||
Power | |||
Measure the distance between external power sources and QFX3100 Director device installation site. | |||
Calculate power consumption and requirements. | |||
Hardware Configuration | |||
Choose the number and types of QFX3100 Director devices you want to install. | |||
Rack or Cabinet | |||
Verify that your rack or cabinet meets the minimum requirements for the installation of the QFX3100 Director device. | |||
Plan the rack or cabinet location, including required space clearances. | Clearance Requirements for Airflow and Hardware Maintenance for a QFX3100 Director Device | ||
Secure the rack or cabinet to the floor and building structure. | |||
Cables | |||
Acquire cables and connectors:
| |||
Plan cable routing and management. |