- play_arrow Overview
- play_arrow Initial Installation and Configuration
- Installing and Connecting an ACX1000 or ACX1100 Router Overview
- Unpacking and Mounting the ACX1000 and ACX1100 Routers
- Connecting the ACX1000 and ACX1100 to Power
- Connecting the ACX1000 and ACX1100 to External Devices
- Register Products—Mandatory to Validate SLAs
- Initially Configuring the ACX1000 or ACX1100 Router
- play_arrow Maintaining components
- play_arrow Troubleshooting Hardware
- play_arrow Contacting Customer Support and Returning the Chassis or Components
- play_arrow Safety and Compliance Information
- General Safety Guidelines and Warnings
- Definitions of Safety Warning Levels
- Qualified Personnel Warning
- Warning Statement for Norway and Sweden
- Fire Safety Requirements
- Installation Instructions Warning
- Chassis and Component Lifting Guidelines
- Restricted Access Warning
- Ramp Warning
- Rack-Mounting and Cabinet-Mounting Warnings
- Grounded Equipment Warning
- Radiation from Open Port Apertures Warning
- Laser and LED Safety Guidelines and Warnings
- Maintenance and Operational Safety Guidelines and Warnings
- General Electrical Safety Guidelines and Warnings
- Action to Take After an Electrical Accident
- Prevention of Electrostatic Discharge Damage
- ACX1100 AC Power Electrical Safety Guidelines
- AC Power Disconnection Warning
- ACX1000 and ACX1100 DC Power Electrical Safety Guidelines
- DC Power Copper Conductors Warning
- DC Power Disconnection Warning
- DC Power Grounding Requirements and Warning
- DC Power Wiring Sequence Warning
- DC Power Wiring Terminations Warning
- Midplane Energy Hazard Warning
- Multiple Power Supplies Disconnection Warning
- TN Power Warning
- Agency Approvals for ACX1000 and ACX1100 Routers
- Compliance Statements for NEBS for ACX1000 and ACX1100 Routers
- Compliance Statements for EMC Requirements for ACX1000 and ACX1100 Routers
- Compliance Statements for Environmental Requirements
- Compliance Statements for Acoustic Noise for ACX1000 and ACX1100 Routers
Site Preparation Checklist for ACX1000 and ACX1100 Routers
The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for ACX1000 and ACX1100 router installation.
Item or Task | For More Information | Performed By | Date |
---|---|---|---|
Environment | |||
Verify that environmental factors such as temperature and humidity do not exceed router tolerances. | |||
Power | |||
Measure the distance between external power sources and router installation site. | |||
Locate sites for connection of system grounding. | |||
Calculate the power consumption and requirements. | |||
Hardware Configuration | |||
Choose the number and types of routers you want to install. | |||
Rack or Cabinet | |||
Verify that your rack or cabinet meets the minimum requirements for the installation of the router. | |||
Plan rack or cabinet location, including required space clearances. | Clearance Requirements for Airflow and Hardware Maintenance on ACX1000 and ACX1100 Routers | ||
Secure the rack or cabinet to the floor and building structure. | |||
Cables | |||
Acquire cables and connectors:
| |||
Plan the cable routing and management. |