- play_arrow Fast Track: Initial Installation
- play_arrow System Overview and Specifications
- play_arrow Installation and Configuration
- play_arrow Maintain Components
- play_arrow Troubleshoot Hardware
- play_arrow Contact Customer Support and Return the Chassis or Components
- play_arrow Safety and Compliance Information
- Safety Information for EX4100-H
- AC Power Electrical Safety Guidelines
- General Laser Safety Guidelines
- General Safety Guidelines and Warnings
- Laser LED Safety Guidelines
- Multiple Power Supplies Disconnection Warning
- Qualified Personnel Warning
- Restricted Access Warning
- TN Power Warning
- Hazardous Area Installation Warning
- General Electrical Safety Guidelines and Warnings
- Definitions of Safety Warning Levels
- Qualified Personnel Warning
- Warning Statement for Norway and Sweden
- Fire Safety Requirements
- Installation Instructions Warning
- Chassis and Component Lifting Guidelines
- Restricted Access Warning
- Ramp Warning
- Cabinet-Mounting Warnings
- Grounded Equipment Warning
- Radiation from Open Port Apertures Warning
- Laser and LED Safety Guidelines and Warnings
- Maintenance and Operational Safety Guidelines and Warnings
- Action to Take After an Electrical Accident
- Prevention of Electrostatic Discharge Damage
- Compliance Standards for EX4100-H Switches
- Compliance Statements for EMC Requirements for EX Series Switches
- Statements of Volatility for Juniper Network Devices
Site Preparation Checklist for EX4100-H Switches
The following checklist summarizes the tasks you need to perform when preparing a site for EX4100-H switch installation.
Item or Task | For More Information | Performed By | Date |
---|---|---|---|
Environment | |||
Verify that environmental factors such as temperature and humidity are within switch tolerances. | Environmental Requirements and Specifications for EX4100-H Switches | ||
Power | |||
Measure the distance between external power sources and the switch installation site. | Clearance Requirements for Airflow and Hardware Maintenance for EX4100-H Switches | ||
Locate sites to connect system grounding. | |||
Calculate the power consumption requirements. | |||
Hardware Configuration | |||
Choose the number and types of switches you want to install. | |||
Cabinet | |||
Verify that the cabinet meets the minimum requirements for installing the switch. | |||
Plan cabinet location, including required space clearances. | |||
Secure the cabinet to the floor and building structure. | |||
Cables | |||
Acquire cables and connectors:
| |||
Plan the cable routing and management. | |||
Wall | |||
Verify that the wall meets the minimum requirements for the installation of the switch. | |||
Verify appropriate clearance exists in your selected location. |