- play_arrow Fast Track: Initial Installation
- play_arrow Overview
- play_arrow Initial Installation and Configuration
- play_arrow Maintaining Components
- play_arrow Contacting Customer Support and Returning the Chassis or Components
- play_arrow Safety and Compliance Information
- Definitions of Safety Warning Levels
- General Safety Guidelines and Warnings
- General Safety Warnings for Juniper Networks Devices
- Fire Safety Requirements
- Installation Instructions Warning
- Chassis and Component Lifting Guidelines
- Ramp Warning
- Rack-Mounting and Cabinet-Mounting Warnings
- Laser and LED Safety Guidelines and Warnings
- Radiation from Open Port Apertures Warning
- Maintenance and Operational Safety Guidelines and Warnings
- General Electrical Safety Guidelines and Warnings
- Prevention of Electrostatic Discharge Damage
- Site Electrical Wiring Guidelines
- AC Power Electrical Safety Guidelines
- AC Power Disconnection Warning
- DC Power Disconnection Warning
- DC Power Grounding Requirements and Warning
- DC Power Wiring Sequence Warning
- DC Power Wiring Terminations Warning
- Multiple Power Supplies Disconnection Warning
- TN Power Warning
- Action to Take After an Electrical Accident
- Agency Approvals for MX204 Router
- Compliance Statements for Data Center
- Compliance Statements for EMC Requirements
- Compliance Statements for Environmental Requirements
- Compliance Statements for Acoustic Noise for MX204 Router
- Statements of Volatility for Juniper Network Devices
MX204 Site Preparation Checklist
The checklist in Table 1 summarizes the tasks you must perform when preparing a site for router installation.
Item or Task | For More Information | Performed by | Date |
---|---|---|---|
Environment | |||
Verify that environmental factors such as temperature and humidity do not exceed router tolerances. | |||
Power | |||
Locate sites for connection of system grounding. | |||
Measure distance between external power sources and router installation site. | |||
Calculate the power consumption and requirements. | |||
Rack | |||
Select the type of rack or cabinet. | |||
Plan rack or cabinet location, including required space clearances. | MX204 Router Clearance Requirements for Airflow and Hardware Maintenance | ||
If a rack is used, secure rack to floor and building structure. | |||
Cables | |||
Acquire cables and connectors:
| Calculating Power Budget and Power Margin for Fiber-Optic Cables |