Wired Network Deployment Workflow
Complete these essential tasks to set up your organization and sites, ensure security, install your devices, and start configuring your network.
|
Category |
Task |
More Information |
|---|---|---|
|
Prerequisites |
Before you can configure your wired network or onboard your devices, you need to complete these tasks in the Juniper Mist™ portal:
|
|
| Understand Admin Permissions | Make sure that your admin account gives you the permissions that you need for your configuration tasks. | Switch Administrator Role Requirements |
| Onboard Switches | Add switches to your Juniper Mist organization, either in a greenfield (new cloud-ready switches) or a brownfield (previously deployed) approach. | Onboard Switches to Mist Cloud |
|
Configure Switch Templates |
For large-scale deployments, instead of configuring each switch individually, we recommend using switch configuration templates to set up and streamline configurations across multiple sites. For smaller deployments or special use cases, you can also configure at the site-level and device-level. |
|
| Assign the Templates to Site | After creating a switch configuration template, assign it to the relevant sites. | |
| Configure Site-specific Settings | This step is applicable if you want to make site-level adjustments to the switch configuration. | |
| Configure Switch-specific Settings |
In an organization level deployment, you might also need to configure parameters that are specific to each switch and cannot be configured via the template. Also, for specific use cases, you can configure an entire switch individually. |
|
| Verify Switch Configuration | Review the configuration applied to your switches and make any updates through the switch details page. | |
| Build Campus Fabric |
After switches are onboarded and configured, you can include them in your campus fabrics topologies. |