- play_arrow Fast Track: Initial Installation
- play_arrow System Overview and Specifications
- play_arrow Initial Installation and Configuration
- play_arrow Maintain Components
- play_arrow Troubleshoot Hardware
- play_arrow Contact Customer Support and Return the Chassis or Components
- play_arrow Safety and Compliance Information
- Safety Information for EX4100-F
- General Safety Guidelines and Warnings
- Definitions of Safety Warning Levels
- Qualified Personnel Warning
- Warning Statement for Norway and Sweden
- Fire Safety Requirements
- Installation Instructions Warning
- Chassis and Component Lifting Guidelines
- Restricted Access Warning
- Ramp Warning
- Rack-Mounting and Cabinet-Mounting Warnings
- Grounded Equipment Warning
- Radiation from Open Port Apertures Warning
- Laser and LED Safety Guidelines and Warnings
- Maintenance and Operational Safety Guidelines and Warnings
- General Electrical Safety Guidelines and Warnings
- Action to Take After an Electrical Accident
- Prevention of Electrostatic Discharge Damage
- AC Power Electrical Safety Guidelines
- AC Power Disconnection Warning
- DC Power Electrical Safety Guidelines
- DC Power Disconnection Warning
- DC Power Grounding Requirements and Warning
- DC Power Wiring Sequence Warning
- DC Power Wiring Terminations Warning
- Multiple Power Supplies Disconnection Warning
- TN Power Warning
- Agency Approvals for EX Series Switches
- Compliance Statements for EMC Requirements for EX Series Switches
- Compliance Statements for Acoustic Noise for EX Series Switches
- Statements of Volatility for Juniper Network Devices
Site Preparation Checklist for EX4100-F Switches
The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for EX4100-F switch installation.
Item or Task | For More Information | Performed By | Date |
---|---|---|---|
Environment | |||
Verify that environmental factors such as temperature and humidity are within switch tolerances. | Environmental Requirements and Specifications for EX4100-F Switches. | ||
Power | |||
Measure the distance between external power sources and the switch installation site. | |||
Locate sites to connect system grounding. | |||
Calculate the power consumption requirements. | |||
Hardware Configuration | |||
Choose the number and types of switches you want to install. | |||
Rack or Cabinet | |||
Verify that the rack or cabinet meets the minimum requirements for installing the switch. | |||
Plan rack or cabinet location, including required space clearances. | |||
Secure the rack or cabinet to the floor and building structure. | |||
Cables | |||
Acquire cables and connectors:
| |||
Plan the cable routing and management. | |||
Wall | |||
Verify that the wall meets the minimum requirements for the installation of the switch. Note that EX4100-F wall mounting requirements are similar to EX3400 wall mounting requirements. | Requirements for Mounting an EX3400 Switch on a Desktop or Wall | ||
Wall mount using a magnet The ferrous wall is required to mount the EX4100-F-12P and/or EX4100-F-12T switch using a magnet pad. | Refer note section under Mount an EX4100-F Switch on a Wall | ||
Verify appropriate clearance exists in your selected location. |