Site Preparation Checklist for EX4100 Switches
The following checklist summarizes the tasks you need to perform when preparing a site for EX4100 switch installation.
Item or Task |
For More Information |
Performed By |
Date |
---|---|---|---|
Environment | |||
Verify that environmental factors such as temperature and humidity are within switch tolerances. |
Environmental Requirements and Specifications for EX4100 Switches |
||
Power | |||
Measure the distance between external power sources and the switch installation site. |
Clearance Requirements for Airflow and Hardware Maintenance for EX4100 Switches |
||
Locate sites to connect system grounding. |
|||
Calculate the power consumption requirements. |
|||
Hardware Configuration | |||
Choose the number and types of switches you want to install. |
|||
Rack or Cabinet | |||
Verify that the rack or cabinet meets the minimum requirements for installing the switch. |
|||
Plan rack or cabinet location, including required space clearances. |
|||
Secure the rack or cabinet to the floor and building structure. |
|||
Cables | |||
Acquire cables and connectors:
|
|||
Plan the cable routing and management. |
|||
Wall | |||
Verify that the wall meets the minimum requirements for the installation of the switch. Note that EX4100 wall mounting requirements are similar to EX3400 wall mounting requirements. |
Requirements for Mounting an EX3400 Switch on a Desktop or Wall |
||
Verify appropriate clearance exists in your selected location. |
Clearance Requirements for Airflow and Hardware Maintenance for EX4100 Switches. |