- play_arrow Fast Track: Initial Installation
- play_arrow Overview
- play_arrow Initial Installation and Configuration
- SRX345 Installation Overview
- Unpacking and Mounting the SRX345
- Connecting the SRX345 to Power
- Connecting the SRX345 to External Devices
- Register Products—Mandatory to Validate SLAs
- Configuring Junos OS on the SRX345
- Installing the Optional SATA Solid-State Drive in SRX340 and SRX345 Services Gateways
- play_arrow Maintaining Components
- play_arrow Troubleshooting Hardware
- play_arrow Contacting Customer Support and Returning the Chassis or Components
- play_arrow Safety and Compliance Information
- Definitions of Safety Warning Levels
- General Safety Guidelines and Warnings
- Restricted Access Warning
- Qualified Personnel Warning
- Prevention of Electrostatic Discharge Damage
- Fire Safety Requirements
- Laser and LED Safety Guidelines and Warnings
- Radiation from Open Port Apertures Warning
- Maintenance and Operational Safety Guidelines and Warnings
- Action to Take After an Electrical Accident
- General Electrical Safety Guidelines and Warnings
- AC Power Electrical Safety Guidelines
- DC Power Electrical Safety Guidelines
- SRX345 Firewall Agency Approvals
- SRX345 Firewall Acoustic Noise Compliance Statements
- SRX345 Firewall EMC Requirements
SRX345 Site Preparation Checklist
Table 1 provides a checklist of tasks you need to perform when preparing a site for installing the SRX345 Firewall.
Item or Task | Additional Information |
---|---|
Environment | |
Verify that environmental factors such as temperature and humidity do not exceed device tolerances. | |
Power | |
Measure the distance between the external power sources and the device installation site. | |
Locate sites for connection of system grounding. | |
Calculate the power consumption and requirements. | SRX345 Services Gateway Power Specifications and Requirements |
Rack Requirements | |
Verify that your rack meets the minimum requirements. | |
Rack Installation | |
Plan the rack location, including required space clearances. | Preparing the SRX345 Services Gateway for Rack-Mount Installation |
Secure the rack to the floor and building structure. | |
Cabinet Requirements | |
Verify that your cabinet meets the minimum requirements. | |
Plan the cabinet location, including required space clearances. | |
Cables | |
|