Site Preparation Checklist for an EX9214 Switch
The checklist in Table 1 summarizes the tasks you need to perform to prepare a site for installing an EX9214 switch.
Item or Task |
For More Information |
Performed by |
Date |
---|---|---|---|
Environment | |||
Verify that environmental factors such as temperature and humidity do not exceed switch tolerances. |
Environmental Requirements and Specifications for EX Series Switches |
||
Power | |||
Measure distance between external power sources and switch installation site. |
|||
Calculate the power consumption and requirements. |
AC Power Supply Specifications for EX9214 Switches DC Power Supply Specifications for EX9214 Switches Power Requirements for EX9200 Switch Components Calculating the Fiber-Optic Cable Power Budget for EX Series Devices Calculating the Fiber-Optic Cable Power Margin for EX Series Devices |
||
Rack or Cabinet | |||
Select the type of rack or cabinet and verify that it meets the minimum requirements for the installation of the switch. |
|||
Plan rack or cabinet location, ensuring the required space clearances. |
Clearance Requirements for Airflow and Hardware Maintenance for an EX9214 Switch |
||
Secure the rack or cabinet to the floor and building structure. |
|||
Cables | |||
Plan the cable routing and management. Acquire cables and connectors:
|