- play_arrow Overview
- play_arrow Initial Installation and Configuration
- play_arrow Maintaining Components
- play_arrow Troubleshooting Hardware
- play_arrow Contacting Customer Support and Returning the Chassis or Components
- play_arrow Safety and Compliance Information
- General Safety Guidelines and Warnings
- Definitions of Safety Warning Levels
- Qualified Personnel Warning
- Warning Statement for Norway and Sweden
- Fire Safety Requirements
- Installation Instructions Warning
- Chassis and Component Lifting Guidelines
- Ramp Warning
- Rack-Mounting and Cabinet-Mounting Warnings
- Grounded Equipment Warning
- Radiation from Open Port Apertures Warning
- Laser and LED Safety Guidelines and Warnings
- Maintenance and Operational Safety Guidelines and Warnings
- General Electrical Safety Guidelines and Warnings
- Action to Take After an Electrical Accident
- Prevention of Electrostatic Discharge Damage
- AC Power Electrical Safety Guidelines
- AC Power Disconnection Warning
- DC Power Electrical Safety Guidelines
- DC Power Disconnection Warning
- DC Power Grounding Requirements and Warning
- DC Power Wiring Sequence Warning
- DC Power Wiring Terminations Warning
- Multiple Power Supplies Disconnection Warning
- TN Power Warning
- Agency Approvals for EX Series Switches
- Compliance Statements for EMC Requirements for EX Series Switches
- Compliance Statements for Acoustic Noise for EX Series Switches
- Statements of Volatility for Juniper Network Devices
- play_arrow Downloads
Site Preparation Checklist for an XRE200
The checklist in Table 1 summarizes the tasks you need to perform when preparing a site for an XRE200 External Routing Engine installation.
Table 1: Site Preparation Checklist
Item or Task | For More Information | Performed By | Date |
---|---|---|---|
Environment | |||
Verify that environmental factors such as temperature and humidity do not exceed external Routing Engine tolerances. | Environmental Requirements and Specifications for EX Series Switches | ||
Power | |||
Measure distance between external power sources and external Routing Engine installation site. | |||
Locate sites for connection of system grounding. | |||
Calculate the power consumption and requirements. | AC Power Specifications for XRE200 External Routing Engines DC Power Specifications for an XRE200 External Routing Engine | ||
Hardware Configuration | |||
Choose the number and types of external Routing Engines you want to install. | |||
Rack or Cabinet | |||
Verify that your rack or cabinet meets the minimum requirements for the installation of the external Routing Engine. | |||
Plan rack or cabinet location, including required space clearances. | |||
Secure the rack or cabinet to the floor and building structure. | |||
Cables | |||
Acquire cables and connectors:
| Cables Connecting the XRE200 External Routing Engine to XRE200 External Routing Engines and EX8200 SwitchesCables Connecting the XRE200 External Routing Engine to XRE200 External Routing Engines and EX8200 Switches | ||
Plan the cable routing and management. |