- play_arrow Fast Track: Initial Installation
- play_arrow Overview
- play_arrow Site Planning, Preparation, and Specifications
- play_arrow Maintaining Components
- play_arrow Troubleshooting Hardware
- play_arrow Contacting Customer Support and Returning the Chassis or Components
- play_arrow Safety and Compliance Information
- General Safety Guidelines and Warnings
- Definitions of Safety Warning Levels
- Qualified Personnel Warning
- Warning Statement for Norway and Sweden
- Fire Safety Requirements
- Installation Instructions Warning
- Restricted Access Warning
- Ramp Warning
- Chassis and Component Lifting Guidelines
- Rack-Mounting and Cabinet-Mounting Warnings
- Grounded Equipment Warning
- Radiation from Open Port Apertures Warning
- Laser and LED Safety Guidelines and Warnings
- Maintenance and Operational Safety Guidelines and Warnings
- General Electrical Safety Guidelines and Warnings
- Prevention of Electrostatic Discharge Damage
- Site Electrical Wiring Guidelines
- AC Power Electrical Safety Guidelines
- AC Power Disconnection Warning
- DC Power Disconnection Warning
- DC Power Grounding Requirements and Warning
- DC Power Wiring Sequence Warning
- DC Power Wiring Terminations Warning
- Multiple Power Supplies Disconnection Warning
- TN Power Warning
- Action to Take After an Electrical Accident
- Agency Approvals for ACX7509 Routers
- Compliance Statements for NEBS
- Compliance Statements for EMC Requirements
- Compliance Statements for Environmental Requirements
ACX7509 Router Installation Overview
Following is a description of the steps that you complete to install and connect the ACX7509 router:
Prepare your installation site as described in Site Preparation Checklist for ACX7509 Routers .
Review the safety guidelines explained ACX7509 Site Guidelines and Requirements .
Unpack the router and verify the parts, as follows:
Verify the ACX7509 Router Parts Received
Lift the router onto the rack manually or by using a mechanical lift.
Note:Because of the weight of the router, we recommend that you use a mechanical lift.
Connect cables to the network and external devices.
Connect the grounding cable as described in Connect Earth Ground to ACX7509 Routers .
Warning:To meet safety and electromagnetic interference (EMI) requirements and to ensure proper operation, you must properly ground the services gateway chassis before connecting power.
Follow the relevant instructions for connecting power for your site.
Perform initial configuration by following the instructions in Perform Initial Software Configuration of the ACX7509 Router .