- play_arrow Fast Track: Initial Installation
- play_arrow Overview
- play_arrow Site Planning, Preparation, and Specifications
- play_arrow Initial Installation and Configuration
- play_arrow Maintaining Components
- play_arrow Troubleshooting Hardware
- play_arrow Contacting Customer Support and Returning the Chassis or Components
Compliance Statements for NEBS
The equipment is suitable for installation as part of the Common Bonding Network (CBN).
The equipment is suitable for installation in locations where the National Electrical Code (NEC) applies.
The battery return connection is to be treated as an isolated DC return (that is, DC-I), as defined in GR-1089-CORE.
You must provision a readily accessible device outside of the equipment to disconnect power. The device must also be rated based on local electrical code practice.