QFX5230-64CD Site Preparation Checklist
The checklist summarizes the tasks you need to perform when preparing a site for a QFX5230 installation.
Item or Task | For More Information | Performed By | Date |
---|---|---|---|
Environment | |||
Verify that environmental factors such as temperature and humidity do not exceed switch tolerances. |
|
| |
Power | |||
Measure the distance between external power sources and switch installation site. | QFX5230-64CD Clearance Requirements for Airflow and Hardware Maintenance |
|
|
Calculate the power consumption and requirements. |
|
| |
Rack or Cabinet | |||
Verify that your rack or cabinet meets the minimum requirements for the installation of the switch. |
|
| |
Plan rack or cabinet location, including required space clearances. |
|
| |
Secure the rack or cabinet to the floor and building structure. |
|
| |
Cables | |||
Acquire cables and connectors:
|
|
| |
Plan the cable routing and management. |
|
|