In this procedure we assume that the device is already
connected to a power source.
For specifications on the electrical requirements for the device,
see CTP151 Platform Chassis Physical Specifications.
CAUTION:
Evaluate the overall loading of the branch circuit
before you install any equipment into a rack.
- Verify that the power source is operational.
- Inspect all grounding and power connections to the device
chassis.
- Confirm that all cable connections are secure.
- Switch any available power switches to ON.
- Monitor the console to verify that the device is booting
up properly.
The device goes through a boot process. When a prompt appears
on the console, the device is ready to be configured. If the device
is new, it boots to a first boot script. If the device is already
operational, it boots to a login prompt.