MX960 Site Preparation Checklist

date_range 09-Mar-21

The checklist in Table 1 summarizes the tasks you must perform when preparing a site for router installation.

Table 1: MX960 Site Preparation Checklist

Item or Task

For More Information

Performed By

Date

Verify that environmental factors such as temperature and humidity do not exceed router tolerances.

MX960 Router Environmental Specifications

   

Select the type of rack or cabinet.

MX960 Cabinet Size and Clearance Requirements,MX960 Rack Requirements

   

Plan rack or cabinet location, including required space clearances.

MX960 Cabinet Size and Clearance Requirements, MX960 Rack Requirements, Clearance Requirements for Airflow and Hardware Maintenance for the MX960 Router

   

If a rack is used, secure rack to floor and building structure.

MX960 Rack Requirements

   

Acquire cables and connectors.

     

Locate sites for connection of system grounding.

MX960 Router Grounding Specifications

   

Measure distance between external power sources and router installation site.

     

Calculate the optical power budget and optical power margin.

Calculating Power Budget and Power Margin for Fiber-Optic Cables

   